Choosing an inert gas fire suppression system comes down to four decisions: which agent, how much of it, how many cylinders, and whether the room will hold the concentration long enough to work. This guide takes them in that order, then shows where an IG100 gas fire suppression system is the natural answer — one industrial gas, no residue, no decomposition products — and where a high-pressure CO₂ unit is the better fit for the room you actually have.

70L 5.7MPa CO2 gas fire suppression system,Guangdong Zhenxinglian Fire Protection Equipment Co., Ltd.,70L 5.7MPa CO2 gas fire suppression system

Six agents, one decision: which gas goes in the cylinder

Every inert gas fire suppression system is judged on the same four things — what the gas does to a fire, what it leaves behind, how it gets refilled, and what it does to the people who work in the room. The table puts IG-01, IG-55, IG-100 and IG-541 side by side, with FM-200 and CO₂ as reference columns.

Decision IG-01 IG-55 IG-100 IG-541 FM-200 (ref.) CO₂ (ref.)
Agent makeup Argon, single gas Argon and nitrogen blend Nitrogen, single gas Nitrogen, argon and CO₂ blend HFC-227ea Liquefied carbon dioxide
Residue after discharge None None None None No residue, but decomposition products can form on hot surfaces None
Refill route Industrial gas supply Blended agent supply Industrial gas supply Blended agent supply Specialty halocarbon supply Liquid CO₂ supply
Occupancy safety Lowers oxygen — occupied rooms need the full life-safety layer Lowers oxygen — occupied rooms need the full life-safety layer Lowers oxygen — occupied rooms need the full life-safety layer Lowers oxygen — occupied rooms need the full life-safety layer Specified for occupied spaces within design limits Toxic to humans — unmanned areas, or safety measures where occupied
Cylinder footprint Largest of the family Large Large — more cylinders per protected volume than a halocarbon agent Large Smallest of the group Compact for the agent mass carried
Where it fits best Argon already handled on site Projects wanting a second supply route for the blend Single gas with the simplest refill chain, and large electrical rooms Projects that want CO₂ included in the agent mix Tight plant rooms where footprint dominates the layout Unmanned plant and process rooms, plus local application onto a machine
Stored pressure High-pressure cylinder; count and pressure set by the room calculation High-pressure cylinder; count and pressure set by the room calculation High-pressure cylinder; count and pressure set by the room calculation High-pressure cylinder; count and pressure set by the room calculation 4.2 MPa variants listed in the catalogue 5.7 MPa at 20 °C; 12.4 MPa maximum at 50 °C

Cylinder count, storage pressure and manifold layout for an IG-100 system are fixed by the enclosure calculation and confirmed on the approved submittal, not by a catalogue line. The datasheet published in full on this page covers the 70 L 5.7 MPa CO₂ unit.

IG-01

Pure argon. One gas to handle and the largest cylinder count per protected volume in the family.

IG-55

Argon–nitrogen blend. Two gases to source, and a refill you can only take from a blended supply.

IG-100

Pure nitrogen. One industrial gas for design and refill, and the simplest supply chain of the four.

IG-541

Nitrogen, argon and CO₂ blend. Adds CO₂ to the mix, which tightens both the supply and the refill route.

Why IG-100 suits a room full of live electrical equipment

IG-100 is nitrogen and nothing else. That single fact drives most of what makes it straightforward to specify. The agent is non-conductive, so a discharge onto a live switchboard does not create a second fault. It leaves no residue, so servers, busbars and terminal blocks do not have to be wiped down or replaced before the room can be re-energised. And because the gas is inert, it does not break down on a hot surface into acidic by-products the way halocarbon agents can — the difference between a room that needs ventilation and a room that needs a replacement programme.

The supply chain matters as much as the fire performance. Nitrogen is an industrial gas with multiple suppliers in most regions, and a refill does not depend on a proprietary blend. After a discharge, or after a cylinder has been taken out of service for periodic inspection, the bank can be returned to design concentration without waiting on a blended-agent shipment. That is a maintenance question rather than a fire question, and it is the one that tends to decide the specification three years after handover.

What IG-100 does not do is protect people on its own. Any inert agent works partly by lowering the oxygen available to the fire, which means it also lowers the oxygen available to anyone still in the room. Occupied spaces therefore need the full life-safety layer: pre-discharge warning, a time delay long enough to leave, a manual abort on the exit route, signage at every door and a controlled re-entry procedure. Those are design decisions, not accessories bolted on at the end.

100% nitrogen A single industrial gas, not a blend — one specification, one refill route.
Zero ODP, zero GWP No ozone-depletion or global-warming penalty to defend in the environmental case.
No residue No clean-up on terminals, boards or archived material before the room goes back to work.
No decomposition products Nothing acidic forms when the gas meets a hot surface during a discharge.

Eight inputs we need before any sizing can start

A cylinder count is an output, never an input. These are the eight things that produce it — each one changes the answer, and each one arrives on a document you probably already have.

1

Net volume, not gross

Agent quantity is calculated on the air volume actually being protected. Columns, ducts, cable trays and standing equipment remove volume; a raised floor or a suspended ceiling can add it.

Supplied by: architectural plan plus a section drawing.
2

Unclosable openings

Permanent openings let agent escape during the hold period. Each one is either closed on discharge or compensated for in the calculation — there is no third option.

Supplied by: door and damper schedule.
3

Enclosure integrity

The room must hold its concentration for the required hold time. A leaky room renews the fire with fresh oxygen while the agent drains away.

Supplied by: a door-fan test report, or a commitment to test before handover.
4

Ambient temperature band

Temperature drives the pressure inside the cylinder, and the equipment has a working range as well. The published datasheet for the 70 L CO₂ unit runs from 0 °C to +50 °C.

Supplied by: HVAC design conditions, summer and winter.
5

Occupancy during discharge

This decides whether the design needs a full life-safety layer, and whether a CO₂ system can be considered for the space at all.

Supplied by: occupancy schedule and normal manning levels.
6

Hazard class

The class of fire in the room sets the design concentration, and the design concentration sets everything downstream of it.

Supplied by: a hazard description — what burns, how it is stored, how it is powered.
7

Ceiling void treatment

A void is either protected separately or folded into the room volume. Get it wrong and one of the two spaces ends up under-protected.

Supplied by: reflected ceiling plan and section.
8

Cylinder-room footprint

Inert agents need a real plant space for cylinders and manifold. If there is nowhere to stand the bank, the design changes before the calculation does.

Supplied by: GA drawing with the available plant area marked. See how the cylinder assembly is built →

From room volume to cylinder count: the six steps

The sequence is fixed even though the numbers are not. Each step depends on the one before it, which is why a wrong figure at step one is still a wrong figure at step six.

01

Fix the design concentration by hazard class

Design concentration is a property of the hazard, not of the brand on the cylinder. It comes from the applicable standard for the class of risk in the room, and it is the single number the whole calculation hangs on.

02

Check what that concentration does to the oxygen

Before the agent quantity is calculated, look at the atmosphere the room will be left with. This is the step that decides whether an inert agent is even permissible for a space people use.

Oxygen remaining ≈ 20.9 × (1 − design concentration ÷ 100)

At a 35% design concentration the room settles near 13.6% oxygen — well below the 19.5% floor normally applied to occupied spaces. That comparison, not the fire performance, is what drives the life-safety design.

03

Convert net volume into agent quantity

Agent mass is a function of the protected volume, the design concentration and the specific volume of the gas being used. Every input from the previous module feeds this one line — this is where a wrong net volume becomes a wrong cylinder count.

04

Convert agent quantity into a cylinder count

Divide the agent requirement by the fill capacity of the cylinder you are using, round up, then check the result against the plant space you have. This is the number that surprises people: inert agents need more cylinders than halocarbon agents for the same room.

05

Lay out the manifold, selector valves and nozzles

One room can run from a manifold and a single pipe route. Several rooms need selector valves so a single bank serves whichever room is on fire. Nozzle count and spacing follow the room geometry, not the cylinder count.

06

Check the pipe run against pressure drop

Long runs, tight bends and undersized pipe all cost pressure at the nozzle. The layout the calculation assumes has to be the layout that gets installed — and this is where the drawing and the site usually disagree first.

The half of the design that is not about the agent

A cylinder bank that discharges into a leaking room is an expensive way to make noise. These six items decide whether the concentration ever reaches the fire.

Hold time

Verified by a door-fan test at handover, and re-verified after any building works that punch a hole in the envelope.

Pressure relief venting

A room that cannot vent will not hold its door closed through a discharge. Relief is sized to the discharge, not picked off a shelf.

Pre-discharge warning

Audible and visual, and distinctive enough that it is not mistaken for the general fire alarm everyone already ignores.

Time delay and abort

Enough delay to clear the room, and a manual abort placed on the exit route rather than behind a locked panel.

Signage and entry control

A warning at every entrance, and a written procedure for re-entry once the system has operated.

Post-discharge ventilation

The room is not breathable until it has been ventilated and the atmosphere measured. Plan the route before the event, not after.

The datasheet we publish in full: 70 L at 5.7 MPa

IG-100 cylinder count, storage pressure and manifold layout are confirmed per room on the approved submittal. The unit with a complete published datasheet is the 70 L high-pressure CO₂ assembly — useful because it shows exactly how storage, actuation and discharge are specified on a high-pressure gas system.

70L 5.7MPa CO2 gas fire suppression system,Guangdong Zhenxinglian Fire Protection Equipment Co., Ltd.,70L 5.7MPa CO2 gas fire suppression system
Container capacity / agent quantity70 L / 42 kg
Storage pressure at 20 °C5.7 MPa
Maximum operating pressure at 50 °C12.4 MPa
Discharge time60 seconds or less
Electromagnetic startDC 24 V, 1.5 A or less
Mechanical emergency startIncluded
Manual startIncluded
Operating temperature range0 °C to +50 °C
Discharge modesTotal flooding of an enclosure, or local application onto a specific hazard
System integrationModular design, built to work with existing fire detection and alarm systems
The datasheet is explicit on this point: CO₂ is toxic to humans and is intended for unmanned areas, or for occupied spaces only with safety measures in place. Read that line before the price line.
Actuation and discharge components of the 70L 5.7MPa CO2 gas fire suppression system

Three ways to fire the system, and why a room usually needs all three

Redundancy in a suppression system is not about the gas — it is about the signal. The documented unit carries an electromagnetic start driven from the control panel at DC 24 V and no more than 1.5 A, a mechanical emergency start for the case where control power is gone, and a manual start at the cylinder itself. Discharge completes in 60 seconds or less once either route operates.

  • Electromagnetic startNormal operation from the detection and alarm system, after the pre-discharge delay.
  • Mechanical emergency startThe fallback when control power or the release circuit is unavailable.
  • Manual startLast resort at the cylinder, for authorised personnel only.

The buyer decision: ask for the actuation matrix in the submittal. It should state which method operates on loss of power, which operates on loss of detection, and who is authorised to use the manual release.

Where these systems actually go — and what each room changes

The same cylinder hardware lands in very different rooms. What changes from one to the next is the occupancy question and the enclosure question, in that order.

70L 5.7MPa CO2 gas fire suppression system installed for an enclosed equipment room

The installation logic in one paragraph

The documented system is described for enclosed or unmanned spaces, and for total flooding of a room or local application onto a specific hazard. It is listed for data centres, control rooms, electrical equipment enclosures, archives, industrial equipment rooms, warehouses, manufacturing plants and critical infrastructure. That list is broad on purpose: the room type sets the hazard class and the occupancy pattern, and those two set the design.

Data centre and server hall

Rapid suppression, no residue, and no clean-up before power is restored to the racks. The datasheet positions the system for spaces where contamination from other agents is unacceptable.

Decision to make: is the hall staffed during working hours? If yes, the life-safety layer is mandatory and an inert agent is the only viable route.

Control room and switchgear enclosure

Live electrical equipment means the agent has to be non-conductive and has to leave nothing behind on terminals. Total flooding of the enclosure is the normal arrangement.

Decision to make: will the enclosure hold pressure, and is there a wall available for relief venting?

Archive and records store

Paper brings deep-seated smouldering risk and contents that cannot be replaced. The system protects the material, so the residue question matters as much as the speed.

Decision to make: what hold time is the room actually built to, and can it be proven on paper?

Industrial equipment room and warehouse

The documented system supports either total flooding of the enclosure or local application onto a specific machine within a larger space.

Decision to make: one hazard or many? More than one protected room means selector valves and a larger manifold.

Scenario to specification: what your project actually changes

Find the row that matches the room you are working on. The middle column is the part of the design that moves; the right-hand column is what shortens the conversation.

Scenario What it changes What to send
Staffed control room with daily occupancy The life-safety layer becomes mandatory, and the design concentration is capped by what the room can safely be left at Occupancy schedule plus the egress plan
Unmanned process or plant room CO₂ total flooding or local application becomes viable, and the agent comparison narrows quickly GA drawing plus the equipment layout
Records store with a specified hold time Enclosure integrity, not the gas, drives the agent quantity and the cylinder count The hold-time requirement, or an existing door-fan report
Retrofit with raised floor and suspended ceiling Void treatment changes the net protected volume and the nozzle layout A section drawing through both voids
Multi-room suite on one cylinder bank Selector valves, pipe routes and pressure drop all enter the design at once Floor plan with every protected room marked

Send the room, not the question

A sizing review is faster than a price list. Give us the room and the constraints, and the reply comes back as a design basis: agent, concentration, cylinder count, manifold and nozzle layout — configured for your project as a custom-engineered solution rather than pulled from a shelf.

STEP 01 Send the drawings

GA and section drawings, plus the room schedule.

STEP 02 Confirm the inputs

We close out the eight inputs — volume, openings, integrity, temperature, occupancy.

STEP 03 Get the sizing basis

Agent quantity, cylinder count and layout, with the assumptions written down.

STEP 04 Receive the project quote

Cylinder bank, valves, nozzles and delivery, quoted as one package.

Request a Project Quote

Related Reading

Three notes to help clarify product requirements before contacting the supplier.

Local Application CO2 Fire Suppression for Industrial Equipment

Local application CO2 protection is easier to understand when you picture nozzles aimed at one machine rather than gas filling a whole room.

Read article

What Does an IG100 Fire Suppression System Include in an Electrical Room?

A typical IG100 system for an electrical room combines pure nitrogen cylinders, valves and a manifold, a piped nozzle network, and the detection and alarm controls that trigger release.

Read article

Total Flooding CO2 System Layout for Data Center Projects

Total flooding CO2 layout for a data center should start with the room as a protected volume, because sealing, nozzle placement, alarm evacuation, and pressure relief decisions determine whether the…

Read article

Frequently Asked Questions

What information is shown for this product?

review the product details, images, and specifications presented on the official product page.

Where can i check the intended application?

use the application and use-case information published on the official product page.

Which specifications should i confirm before ordering?

confirm the specifications and options listed for the exact product variant before placing an order.

Where can i check available options?

check the official product page or ask the supplier about options shown for the selected product.

How can i request product information?

use the official contact or inquiry path provided on the site.

What should i include in an inquiry?

include the product page, intended use, required quantity, and any specifications you need the supplier to review.